(SWMS) Construction
Suncoast Safety provides all Safe Work Method Statements (SWMS) & Mobile Plant Risk
Assessments in Electronic editable PDF format and hard copies posted to you.
We also provide 7 days a week of help and support including after hours.
We also offer to review ; update all safety documentation on a 12 monthly basis.
We are here to help and support you and your business with nearly 15 years of experience.
Areas we service are Sunshine Coast, Brisbane, Gold Coast, Wide Bay, Hervey Bay,
Bundaberg, North Brisbane, Ipswich, Toowoomba, South Brisbane, Tweed, New South
Wales, Victoria, Northern Territory, Western Australia, North Queensland, Central
Queensland, Cairns, Townsville, Rockhampton, Mackay
Ring us today for a free no obligation quotation
Duty Holders
A person conducting a business or undertaking carrying out high risk construction
work is required under the Work Health and Safety Regulation 2011 (WHS
Regulation) to:
- ensure that a safe work method statement (SWMS) is prepared before the
proposed work starts - make arrangements to ensure that the high risk construction work is carried
out in accordance with the SWMS - ensure that a copy of the SWMS is given to the principal contractor before the
work starts - ensure that a SWMS is reviewed and revised if necessary
- keep a copy of the SWMS until the high risk construction work is completed.
All duty holders involved in a high risk work activity must make sure:
- the work is carried out in accordance with the SWMS
- if the work is not carried out in accordance with the SWMS, the work is:
# stopped immediately or as soon as it is safe to do so
# resumed in accordance with the statement - all SWMSs are given to the principal contractor prior to work commencing
- SWMSs are kept so as to be readily available for inspection.
- A new Safe Work Method Statement (SWMS) tool has been published on the Safe Work Australia website to provide guidance on what a SWMS does, how it makes a difference, how to prepare one, and how to use it in the workplace and keep it up to date. Visit the Safe Work Australia website to access the tool.
Preparing
A PCBU that carries out high risk construction work must ensure a SWMS is prepared or has already been prepared by another person before the proposed work
commences.
If more than one PCBU is involved then each PCBU must, so far as is reasonably practicable, consult, cooperate and coordinate activities with all other PCBUs.
A PCBU (in consultation with workers who will be directly engaged in the high risk construction work) is best placed to prepare the SWMS because they understand the work being carried out and the workers undertaking the work and can ensure the SWMS is implemented, monitored and reviewed correctly.
There may be situations where there are different types of high risk construction work occurring at the same time at the same workplace.
Examples (These examples are indicative and provided as guidance only)
- Work is being carried out:
#where there is a risk of a person falling more than 2m
#on a trench with an excavated depth greater than 1.5m.
If this is the case, it is possible for one SWMS to be prepared to cover all the high risk construction work being carried out at the workplace. Alternatively, a separate SWMS can be prepared for each type of high risk construction work. If separate SWMSs are prepared, thought must be given to how the different work activities may impact on each other and whether this may lead to inconsistencies between the various control measures.
- A contractor is engaged to work on a structure that is above 2m. Another contractor is engaged to carry out work using powered mobile plant such as a
crane operation.
Both contractors are required to prepare SWMS, the:
# first contractor must ensure a SWMS is prepared for the work that is being carried out above 2m
# second contractor must ensure a SWMS is prepared for the work on the powered mobile plant.
In this case, the contractors may decide to prepare one SWMS to cover both types of high risk construction work or they may decide to prepare separate SWMSs. If separate SWMSs are being prepared, consultation, coordination and cooperation between the contractors must occur to the extent necessary to avoid inconsistencies and ensure that each contractor is carrying the work out safely.
Generic safe work method statement (SWMS)
A generic SWMS may be prepared and used for work activities that are carried out on a regular basis. The content of this type of SWMS may be refined over a number of years and include consultation with workers and other PCBUs. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual workplace.